The fermentation of organic fertilizer includes tank fermentation, pool fermentation and stack fermentation.
The civil engineering design requires different requirements for each fermentation. For tank fermentation, several rows of equally spaced grooves with a height of more than one meter need to be built on the ground.
The groove and groove spacing are determined by the pile turning width of the purchased machine, so that we can realize the multi operation production mode.
Pond fermentation requires digging ponds in the field and stacking materials in the ponds for fermentation. The stacker used for tank fermentation and tank fermentation is the same, but the problems of tank fermentation and unloading are difficult to solve, which is not as easy as unloading with forklift for tank fermentation.
There is no need to build tanks and dig ponds in the field for cascade fermentation, and there are few civil works. But Zhouzhuan is a walking machine. The fermentation height of the material is too low, and the fermentation effect is not trough or pool.
More detailed info on organic fertilizer fermentation technology, go to https://compostturnermachine.com/