Wednesday, 25 August 2021

4 Setps to Speed Up Your Composting Process

Solutions to the failure of composter in the production of biological fertilizer project:

The compost dumper is used for the fermentation of livestock manure, sludge waste, sugar mill sludge, residue cake, straw sawdust and other organic waste. Due to the different water content of the material, the material is viscous. The difference is that the trough turnover machine is easy to overturn in operation.

SX heavy industry has been engaged in the production and sales of compost tuner for many years. Fully mastered the operation skills of the tank car. This can be avoided by following the steps below (take cow dung as an example):

1. Add bacteria. 1 kg starter can ferment about 10 tons of sludge + cow dung. 30-50% cow dung, rice straw powder, mushroom residue, peanut shell powder, rice husk, sawdust and other organic substances need to be added to adjust air permeability. If rice husk and sawdust are added, the fermentation time will be prolonged due to the high content of cellulose and lignin.

2. Pile construction for windrow composting. After the materials are ready, build a bacterial pile (organic fertilizer cycle). The pile height and volume cannot be too short or too small. Requirements: the pile height is 1-1.3m, the width is 2-3m, and the length is unlimited

3. Moisture. The water content of fermented material shall be controlled at 60-65%. Moisture judgment: hold the material tightly, see the watermark but do not drip, and it is appropriate to land. Slow water fermentation, poor water quality and poor ventilation will also lead to the work of spoilage bacteria and produce peculiar smell.

4. Temperature. The initial temperature should be above 15 ℃ (it can be operated in four seasons and is not affected by seasons. It should be fermented indoors or in Greenhouse in winter), and the fermentation temperature should be controlled below 70-75 ℃.

More detailed info, go to https://compostturnermachine.com/


No comments:

Post a Comment